Skip to content

Reviewable Increments

  • Implement at most three steps of a plan, then stop and summarise what changed
  • After the summary, propose the next three steps and wait for confirmation
  • Keep each pause point in a working state: it builds and passes the project’s verify commands
  • Prefer several small diffs a human can read over one diff nobody will read
  • Never bundle an unrelated refactor into a change that was asked for
  • When a change turns out to be larger than expected, say so and re-plan rather than pushing through